Dear Residents,
We have two issues with the pool right now. They are both impactful. The water heater pipe in the attic broke. Water poured into the ceiling and bathrooms approx 2 1/2 hours before it was discovered. We are presently having mitigation done to dry out walls and ceilings in bathrooms. Due to the electrical equipment being used, we cannot lock bathrooms. So for the safety of residents and the restoration company equipment, the pool is closed. Secondly, chemical balancing has been tough this year. We are okay for a half day and then the cyanuric acid level becomes high. Once the restoration drying equipment is removed opening will happen as it becomes safe for all.